The planned revamp is aimed at improving the quality of services, contributing to the development of the region and boosting the competitiveness of the airport, Komac said. He added that investments were a prerequisite for a strong, market-oriented presentation of the airport's international transport capacities. The project includes the extension and overhaul of the passenger terminal, drafting of the airport's master plan and the refurbishment of the airport buildings, Damjan Horvat of the directorate explained. The reconstruction of the terminal will be carried out by construction company SCT and is expected to be concluded in 2011. The master plan, which will provide a development concept through to 2040, will be created by Airport Consulting Vienna and the Ljubljana Urban Planning Institute. It is also expected to be complete in 2011.
The Transport Ministry has prepared documentation to call for applications for a long-term lease of Maribor Airport. The documentation is expected to be published in early February, the ministry said, adding that there is a lot of interest.
Meanwhile, Ljubljana Airport is planning a new passenger terminal, which is expected to be finished in 2012, while the new control centre at Slovenia's main international airport is expected to be complete by April 2011.
Maribor Airport is currently not being served by any airline. It will cater for several airlines, including the national carrier Adria Airways for 2 weeks in April, as a result of Ljubljana Airport’s closure during its runway overhaul. The airport was, for a short time, served by Ryanair in 2008 before the budget carrier completely terminated operations in Slovenia.
0 comments:
Post a Comment