The Defining Moment of Mankind
Terminal 2 expansion soon
The CEO of Belgrade Nikola Tesla Airport, Velimir Radosavljević, has said that with nearly 3 million passengers in 2010, Belgrade’s airport can expect large scale investment in 2011, Serbian media report. From January 1, Belgrade slashed its landing fees, which should attract more low cost airlines. According to the CEO, the airport will see an increase of at least 15% in 2011 compared to last year , passenger wise, most of which will come from low cost carriers. Wizz Air will open its base in Belgrade on April 1. “We are trying to create a free and fair market for everyone. No one has any special treatment and no one is discriminated against”. Radosavljević noted.Two major investments are planned for the airport in 2011, the expansion of Terminal 2 and the expansion of the parking platform. “The most important investment in 2011 will be the expansion of the terminal which will increase passenger comfort and services. We have to be very careful not to disturb other traffic during the expansion. This is why we have divided the project into 14 phases. There will be 8 new gates added to the terminal and the new areas will be opened once each phase of the project is complete”, Radosavljvević explains. He added that the expansion of the parking platform, which will allow more airlines to use the parking area instead of the gates, has already begun. “We have already connected our two main platform areas. We will add another one stretching over the size of 2 football pitches”.
More missing freinds
ZK-CKU is another 185D. Its c/n was 185-0931. Seen here in the old Tauranga hangar in its Adastra scheme in March of 1969. In the 70's it went onto floats and in this mode it crashed at Waihora Bay on Lake Taupo on 19-02-1978.
Two more of Mount Cook 185s. Above is the A185F ZK-COH c/n 185-1009 as seen on the private strip at Franz Josef on 05-04-1972. It has a undercarriage collapse on the Fox Glacier on 06-12-1980. Fortunately this airframe was rebuilt and became ZK-LJG in November of 1996, and as such we should see her at Masterton.
ZK-VDQ - Very Darned Quick Lancair
Skopje’s new terminal ready by October
On time and on budget, Skopje Alexander the Great Airport’s brand new terminal is set to open in time for the 2011/2012 winter season, in October. Macedonia’s Prime Minister, Nikola Gruevski, visited ongoing work on the construction of the multi million Euro terminal. Besides the new terminal, Skopje’s runway is also being extended, which will allow larger aircraft to land, while a new administrative building, a cargo storage building, new access roads, new parking for 250 vehicles and 100 taxis and a new fire department building are all under construction or have already been constructed.“We are building a terminal ten times greater than the current one”, Gruevski said. The Prime Minister noted that some facilities will be ready by June. A total of 120 million Euros will be invested into both Skopje and Ohrid airports while additional funds will be set aside for a cargo airport in Štip, in the country’s East. By extending the current runway at Skopje, Gruevski believes that the airport will be able to handle long haul flights. Skopje is expected to see a big increase in passenger numbers this year, according to the airport’s management, on top of the impressive results recorded in 2010. Reconstruction of Ohrid’s terminal and is expected to be completed by April this year. Macedonia’s two airports are run by the Turkish company TAV.
FAA Take 2: Gliders Can "Feather"
The official description simply removes the word "auto" from the term "autofeathering". It's more of a semantic rather than practical change, updated to reflect actual hardware modes already out there.
In effect, the amendment embraces both manual and autofeathering ops for powered LSA gliders.
Anyone who wants to comment can go to the link above until Feb. 2, 2011. The final rule becomes official on March 4, 2011.


